Back to All Events

Site Tour: North End Water Pollution Control Centre Part 2

This tour is sold out - email yclm@winnipegconstruction.ca to join the waitlist.

Join YCLM for our second tour of the North End Water Pollution Control Centre (NEWPCC) on April 27.

The NEWPCC Headworks Upgrades includes the construction of three new tunnels to redirect sewage to a new 22m deep fully redundant sewage pump station. The sewage will be then pass through a set of four self-cleaning screens to remove large solids, and then pass through a set of 10 grit removal cells. The resulting effluent will then be returned to the existing treatment plant for final treatment. The project includes the construction of a back up generator building, a new control room, a solids handling facility, a new transformer yard, and odor control.

Representatives from Red River Solutions, an Oscar Renda - AECON General Partnership, will be on hand guiding the tour.

Following the tour we’ll be heading to a nearby restaurant or lounge for drinks, appetizers and networking with colleagues.

Date: Thursday, April 27 (rain date May 4)
Time: 3:30 p.m.
Location: 306 Highland Avenue
Cost: $25, includes appetizers at networking event (location TBD)

PPE: Required: CSA hard hat, min. 6” high CSA safety boots, safety glasses, high visibility vest, pants, and gloves. Prefer long sleeves on shirts. The site is very uneven and we recommend individuals with mobility impairment contact us for recommendations.

Thanks as always to our generous 2023 Sponsors!